In this assignment, you will answer to 19 questions related to the content of Chapter 01 – Estimating Practices of your textbook (pages 1-16). Those questions are the same questions contained on Review Questions (pages 17 – 19). This assignment is designed to help you to understand better the main concepts of the Chapter 01 and to make it easier for you to retain those concepts.
This assignment applies the relevant learning goals:
In this assignment you will find different types of questions such as fill-in the blanks, matching, and essay questions, for example.
Question 1
1 / 1 pts
1. _______ is the computation of construction costs of a project.
Correct Answers
Estimating
Question 2
1 / 1 pts
2. A(n) _______ is a change to the originally issued construction contract documents.
Correct Answers
addendum
Question 3
1 / 1 pts
3. A (n) _______ is an offer to perform construction work at a stated price.
Correct Answers
Bid
Question 4
1 / 1 pts
4. A(n) _______ is a conference in which all interested parties in a construction project review the project, ask questions of the architect or owner concerning method for accomplishing the work, and share information necessary to understand the entire scope of the work.
Correct Answers
pre-bid meeting
Question 5
1 / 1 pts
5. _______ is any business expense that is not chargeable to a particular part of a construction project.
Correct Answers
Overhead
Question 6
1 / 1 pts
6. A cost _______ is a compilation of a number of cost items from various sources in a common reference table.
Correct Answers
Index
Question 7
1 / 1 pts
7. An estimating _______ is the system used to integrate all parts of the estimating process in a cohesive, consistent, and reliable manner to ensure an accurate final bid.
Correct Answers
Practice
Question 8
1 / 1 pts
8. _______ is the practice of reviewing construction contract documents to determine quantities of materials that are included in a bid.
Correct Answers
Quantity takeoff
Question 9
1 / 1 pts
9. _______ is a process in which construction personnel employed by the firm developing the bid, such as project managers, estimators, and engineers, are allowed to recommend changes to the construction contract documents.
Correct Answers
Value engineering
Question 10
1 / 1 pts
10. _______ estimating is an estimating practice in which material quantities, equipment, and labor costs are included in a single calculation based on a specific quantity of construction put in place.
Correct Answers
Crew-based
Question 11
1 / 1 pts
U.S. Government Agencies
Correct!
1. Occupational Safety and Health Administration (OSHA): B. Requires employers to provide a safe environment for their employees
Correct!
2. Environmental Protection Agency (EPA): A. Controls and reduces pollution of air, water, solid waste, pesticides, radiation, and toxic substances
Correct!
3 . Office of Federal Contract Compliance Programs (OFCCP): C. Promotes affirmative action and equal employment opportunity on behalf of minorities, women, the physically challenged, and veterans
Unanswered
Question 12
0 / 1 pts
12. Identify the four levels of estimating for interim estimates and briefly define each level.
Question 13
1 / 1 pts
13. Contrast detail takeoff estimating and crew-based estimating.
Question 14
1 / 1 pts
14. Describe the purpose of a pre-bid meeting and list the people who are typically involved in the meeting.
Question 15
1 / 1 pts
15. Identify four variables that may be introduced into the estimating process due to a project location.
Question 16
1 / 1 pts
16. Define “value engineering” and how it may impact a building design and estimate.
Question 17
1 / 1 pts
17. Cite one advantage of using web-based reference material over printed reference material.
Question 18
1 / 1 pts
18. Describe overhead expenses and explain how each project contributes to covering those costs.
Question 19
1 / 2 pts
19. Describe mobilization and how it impacts the project.